Hello,
I do a weekly check of what's going on in OVH
and I noticed something interesting for all of you.
How would you like to accompany me on a white
knuckle ride through the different places around
OVH to see for yourselves how things are progressing.
Okay? Yes, then I can make that happen. Yes, it is not
the most beautiful place, Roubaix Valley, this morning ...
Small mess, eh ... good its gone? .... Shall we begin? Roubaix 3 or 1? 1? okay.
Roubaix 1, let's start ...
We are working to increase the height of the chimneys for the
generators. This is a request from DREAL.
http://demo.ovh.net/view/d7e6eddefc8...9ff717c0a17c/9
Drainage systems for heat from the water circuit. This
life blood of the datacentre. To remove heat from
them with a minimum power output, there is no better solution:
http://demo.ovh.net/view/d7e6eddefc8...9ff717c0a17c/1
ASR 9010 with a 320Gbps connected and waiting for the other side
to a 320Gbps and with its little brother at 640Gbps. That pings like:
http://demo.ovh.net/view/d7e6eddefc8...9ff717c0a17c/0
The system to update the switch in 1 click for
the team that works 24hour in the data centre:
http://demo.ovh.net/view/d7e6eddefc8...9ff717c0a17c/7
A redback for testing ADSL and SDSL with a
goal of 200Mbps symmetrical, for a client alpha test
http://demo.ovh.net/view/d7e6eddefc8...ff717c0a17c/11
Now, on to Roubaix 2 ...
It hosts the NAS-HA, a fully redundant NFS of
2 HG servers which are concurrently connected to the
drive bay which is located in the middle. 100% availability
http://demo.ovh.net/view/d7e6eddefc8...9ff717c0a17c/5
Cloud Computing is preparing to launch. So we are preparing the new
rooms. Walls have been fabricated ...
http://demo.ovh.net/view/d7e6eddefc8...9ff717c0a17c/6
.... holes in the ground for air ...
http://demo.ovh.net/view/d7e6eddefc8...ff717c0a17c/10
.... with electric power of 20000V ...
http://demo.ovh.net/view/d7e6eddefc8...9ff717c0a17c/8
In short, this will be the new standard.
then Roubaix 3 ...
Some lifting work outside of the datacentre
with holes in the building to get air in.
It'll be pretty in 2 months
http://demo.ovh.net/view/d7e6eddefc8...9ff717c0a17c/2
Finish the tour with Roubaix 4 ...
The new datacentre Roubaix 4 takes to the skies ... if
you feel dizzy I suggest you stay on the ground ...
Here you have your helmet ... here we go ...
as seen before ... work is in progress ...
http://demo.ovh.net/view/d7e6eddefc8...9ff717c0a17c/3
.... its part of the current project within ...
http://demo.ovh.net/view/d7e6eddefc8...ff717c0a17c/14
.... to get to the inside of the datacentre, which is currently hollow ...
http://demo.ovh.net/view/d7e6eddefc8...9ff717c0a17c/4
.... and now we have arrived on the roof ... see inside the top ...
http://demo.ovh.net/view/d7e6eddefc8...ff717c0a17c/13
Roubaix and is seen on the East ...
http://demo.ovh.net/view/d7e6eddefc8...ff717c0a17c/12
Cool, there is still more space for the future here ...
.... we will go down quietly ... Here ... I hope
that you liked this little trick. See you next week?
Thank you.
Regards
Octave