rbx4, pCC et 225kV


elvis1
08-08-2011, 07:32
Quote Originally Posted by Razakel
Would you really want to rely on turbines?
They're actually not very good.



its like what people say about solar energy : " what do we do when we donīt have sunlight"? :S

Razakel
27-03-2011, 21:04
Quote Originally Posted by elvis1
why purchase long term energy when you are developing turbines ?
Would you really want to rely on turbines? They're actually not very good.

elvis1
27-03-2011, 18:54
why purchase long term energy when you are developing turbines ?

HandsomeChap
24-03-2011, 00:02
Hello,
Some news in bulk:

- PrivateCloud (CPC): the offer is formally launched.
gamma version. That is, everything is stable
except billing. We therefore validates and explains the
billing service with cost estimates,
quotes, orders, time-servers etc..
During this gamma fee unless the service is all
services that are available now until the end of the month.
Otherwise the service is technically stable
It is very pleasant and we are quite happy with the result.
We continue to improve and complete the site (there are already
some content to read ...). Commands the 1st PCC
you are past since Friday delivery
this time.

- VPS: the service is stable. one book. It remains
to complete the site and bring in subsidiaries.
One bump in the HA and the HP and IPv6 (see roadmap).
There is nothing special to say except that the
service may be of quality since it is based on
just ... PCC

- Exchange for business: stable and one book.
It's fairly new at OVH. SaaS way. And we
think not offer quite expensive to be credible.
I think it will be fixed with the version and vendor
shared that are eagerly awaited.

- All these new services must not be forgotten
shipments supported dedicated servers that advance
a very rapid pace since the beginning of the year. It
well but in the datacentre RBX3 it is space
for 3-4 weeks. As a result, is RBX3
full. Our 4th datacentre There will probably
exceeded 100,000 servers at that time but before
announce, we'll ... count and confirm everything with
an usher. This will avoid discussing and disputes.

- So for 2 weeks, activated at 200% to finish
RBX4 the new datacentre. The famous cube. It will be
very difficult to be on time because we bump
same time on a second room for the CCP ... Briefly,
must decide tomorrow what will probably be delayed ...

- In the Cloud family, we will add only
publiCloud is simply dedicated server
Hourly rentals for specific needs and without
installation costs. It is the interface and mC
its infrastructure has been provided for this service and will therefore move
final version called "Public Cloud".

- All other projects under the name "cloud" are blocked
minimum of 6 months. The idea is to allow you to digest
Cloud already all that offers at the moment. Then
complete the range, if necessary, by the end of the year
2011. Nothing before in addition to what is being proposed now. We
Therefore:
- VPS
- PubliCloud (mC)
- PrivateCloud (LFL)
And the rest, for now, we forget.

- We started the discussions with the RTE (Network and
Transmission of Electricity) to interconnect
directly with them and very high voltage
(90kV and 225kV) instead with EDF high voltage
(20kV). The opposite of talking with EDF that last
usually 2 years from the first appointment and
powering the station 20kV, you know you share
with RTE on a 3 year cycle ... Why then
OVH is interested to discuss with RTE? To buy
electricity cheaper and have many
electrical power per address. It is with EDF
limited to 10MVA per address with EDF and we know that
price will increase in years to come ... Although
investments are extremely high voltage
expensive, given the amount of energy Ovh buys
we will soon win the third year is from ...
2017/2018 if everything goes well. Yes it's pretty weird
talk to year and ... seconds for deliveries
on Cloud Computing

oles@ovh.net
23-03-2011, 21:44
Hello,
Some news in bulk:

- PrivateCloud (pCC): the offer is formally launched in gamma version. That is, everything is stable except billing. We are therefore validating and explains the billing service with cost estimates, specifications, controls, server hours etc.. During this gamma, the service is paid unless all services are offered one hour upto the end of the month. Otherwise the service is technically stable is very pleasant and we are quite happy with the result. We continue to improve and complete the site (there is already some content to read ...). The 1st orders of pCC you did last Friday are now being delivered.

- VPS: the service is stable. we're delivering. It only remains to complete the site and bring in the subsidiaries. One bump in the HA and the HP and also IPv6 (see roadmap). There is nothing special to say except that service may be based on precisely the same quality as the ... pCC

- Exchange for business: stable and we're delivering. It's fairly new at OVH. SaaS way. And we think that we weren't proposing it high enoughto be credible.
I think it will be fixed with the reseller and shared hosting versions which are eagerly awaited.

- With all these new services we must not forget the sustained delivery of dedicated servers that are progressing at a rapid pace since the beginning of the year. This is going well but in the RBX3 datacentre there remains room for only 3 to 4 weeks. Next, RBX3 will be full. Our 4th datacentre will probably exceed 100,000 servers at that time but before announcing it, we'll ... count and confirm everything with a bailiff. This will avoid discussions and disputes.

- So for 2 weeks, we will be working at 200% to finish the new RBX4 datacentre . The famous cube. It will be very difficult to be on time because we're moving along on a second room for the pCC ... short, we must decide tomorrow what will most likely be delayed ...

- In the Cloud family, we will add only publiCloud, a simple dedicated server rented by the hour for ad hoc needs and without
installation costs. It has a mC interface and there will also be an infrastructure planned for this service that will therefore move it into a final version called "Public Cloud".

- All other projects under the name "cloud" are blocked for at least 6 months. The idea is to allow you to digest all the Cloud already proposed to you right now. Then complete the range, if necessary, by the end of 2011. Nothing before in addition to what is being proposed now. We have:
- VPS
- PubliCloud (mC)
- PrivateCloud (LFL)
And the rest, for now, we forget.

- We started the discussions with the RTE (Network and Electricity Transport) to interconnect directly with them and with a very high voltage (225kV and 90kV) instead with an EDF high voltage (20kV). The opposite of talking with EDF, which usually last two years between the first appointment and getting the 20kV power post, you know that with RTE you share it on a 3 year cycle ... Why then OVH is interested to discuss with RTE? To buy the cheapest electricity and have a lot of electrical power per address. With EDF it is limited to one per address 10MVA with EDF and we know that the price will increase in years to come ... Although investments in high voltage are extremely expensive, given the amount of energy Ovh buy, we will soon win the third year from ... 2017/2018 if everything goes well. Yes it's pretty weird to talk in years and ... seconds for deliveries on Cloud Computing

Regards
Octave